Planning guide

The Orlando Homeowner's Renovation Planning Guide

What to decide before you call anyone, what the age of your house is telling you, who has a say in the work, and how to read a proposal. Written for homeowners, not contractors.

Kingdom Come Solutions · Updated November 20, 2026

1. Decide what problem you are solving

Most renovations that go badly start with a solution instead of a problem. "We want an island" is a solution. "Two people cannot cook in this kitchen at the same time" is a problem, and it may have a better answer than an island.

Before you speak to anyone, write down three things:

  • What does not work today. Be specific. Not enough storage, no place for guests to sit, a shower nobody wants to use.
  • How long you expect to stay. A house you will sell in three years and a house you will retire in call for different decisions.
  • What must not change. The view from the sink, the original floors, the room the dog sleeps in. This list is as useful as the wish list.

2. Let the age of the house tell you what to expect

Central Florida homes were built in waves, and each wave has its own habits. Knowing which one your house belongs to tells you what is likely to be found once a wall is opened.

Before about 1960

Common in Winter Park, College Park, Delaney Park and the older parts of Winter Garden. Expect plaster walls, original wood floors that are often worth saving, small closed kitchens and compact bathrooms. Drain lines are frequently cast iron and supply lines may be galvanized steel. Both have a service life, and a renovation is the practical time to deal with them.

1960s through 1970s

Ranch homes on concrete slabs. Cast iron drains run under the slab in many of these houses, and some homes from the late 1960s and early 1970s were wired with aluminum branch circuits. Neither is a reason to panic. Both are reasons to ask a licensed plumber or electrician to look before you finalize a plan.

1980s through 1990s

Common in Dr. Phillips, Lake Mary, Heathrow and much of Oviedo. Larger floor plans, sunken living rooms, textured ceilings, soffits over the kitchen cabinets and garden tubs. Some homes of this period were plumbed with polybutylene supply pipe, which is worth identifying early.

2000 and later

Baldwin Park, Lake Nona, Celebration's later phases and most of Horizon West. The layout and systems are modern. What owners usually change is the builder's finish package: cabinets, counters, flooring, lighting and trim.

One rule for every age of house: the first walk-through should include a look at what cannot be seen from the room. The attic, the electrical panel, under the sinks and the outside of the wall you plan to open.

3. Know who has a say in the work

In Central Florida, up to three parties can have a say in a renovation besides you.

  • The building department. Which one depends on the address. Homes inside city limits are permitted by that city, such as Orlando, Winter Park, Winter Garden, Lake Mary or Oviedo. Unincorporated areas such as Dr. Phillips fall under Orange County, Heathrow under Seminole County and Celebration under Osceola County. Ask early which parts of your project need a permit.
  • Your homeowners association. Most associations do not review interior work, but nearly all of them set rules for contractors: working hours, gate access, parking, dumpsters and deliveries. Exterior changes usually need written approval before work starts, and approval can take weeks.
  • Historic preservation review. If your home is in a designated historic district or is individually designated, exterior changes such as windows, doors, siding and additions are reviewed. Interior work generally is not.

None of this is a reason to delay. It is a reason to ask at the beginning, so the schedule you are given is one that can actually be kept.

4. Settle the budget range before the design

It is tempting to design first and price later. That order produces drawings you love and cannot build. Give your contractor an honest range at the first meeting. A good one will tell you what that range does and does not buy, and will design to it.

Keep part of the budget back for what the house reveals. In an older home, a contingency is not pessimism. It is what allows a problem behind the wall to be fixed properly instead of covered up.

Decide, too, where the money should be felt. Most people are happier spending on what they touch every day, such as cabinet hardware, faucets, flooring and lighting, than on things that only photograph well.

5. How to read a proposal

A proposal is a description of what you are buying. If you cannot tell from the page what will be done, it is not finished. A sound proposal answers these questions in writing:

  • Scope. What is being done, room by room, in plain language.
  • What is not included. Exclusions matter as much as inclusions. Painting, appliances, permits and disposal are the usual surprises.
  • Allowances. If a line says "tile allowance," ask what that amount buys and what happens if your choice costs more.
  • Timeline. A start, a finish, and what could move either one.
  • Payment schedule. Payments tied to completed stages of work, not to dates on a calendar.
  • Changes. How a change is priced and approved. The answer should be "in writing, before the work is done."
  • Who is on site. Who runs the job day to day, and who you call with a question.

When you compare two proposals, compare what each one includes before you compare the totals. The lower number is very often the shorter list.

6. Questions worth asking any contractor

  1. Who will be in my home each day, and will I meet them before work starts?
  2. Who holds the license for this work, and how can I verify it? Can I see proof of insurance?
  3. How will I hear about progress, and how often?
  4. How do you protect the parts of the house that are not being renovated?
  5. What happens when you find something unexpected behind a wall?
  6. What does the end of the job look like? Is there a walk-through and a written list?
  7. If something needs attention six months later, who do I call?

Listen less to the answers than to how easily they come. A contractor who has a process answers these without stopping to think.

7. Timing a renovation in Florida

  • Hurricane season runs from June through November. Interior work continues as usual. Exterior work, and anything that opens the building to the weather, needs a schedule with room in it.
  • Materials set the pace. Custom cabinetry, stone, windows and special order tile have lead times. Selections made early keep a job moving. Selections made late stop it.
  • Work back from the date that matters. If you want the kitchen finished before the holidays, the decisions have to be made well before autumn.
  • Plan how you will live. Decide where you will cook, where the pets will stay, and which bathroom remains in service, before the first day of work.

8. A one page checklist before you call

  • What is not working today, in a few sentences
  • How long you plan to stay in the home
  • The things that must not change
  • The year the house was built, if you know it
  • Whether you have an association, and a copy of its rules for contractors
  • An honest budget range
  • Any date the work needs to be finished by
  • Photographs of the rooms, and of anything that worries you

Bring that page to the first conversation and you will get better advice from anyone you speak to.